Record Details
Field | Value |
---|---|
Title | page 93 Final Environmental Statement : authorized Bonneville Unit, Central Utah Project, Utah, page 93 |
Coverage | Electronic reproduction; |
Source | Bureau of Reclamation. Department of the Interior |
Publisher | Brigham Young University |
Date | 2005-10-14 |
Format | 93 text/PDF |
Rights | Brigham Young University; http://lib.byu.edu/about/copyright/generic.php Public Domain Public |
Language | English; eng; en |
Relation | Central Utah Project; Western Waters Digital Library; table A 7 upper provo river reservoir stabilization physical data storage I 1 1 maximum dam maximum right capacity height area reservoir acre feet acre feet feet acres big elk 87110 871 10 871 30 46 crystal 38 60 60 7 12 duck 420 420 18 37 fire 108 108 90 12 12 island 9770 97 TO 70 98 8 27 long 824.10 82410 863 26 54 lost 690 69054 690.54 69054 54 1325 25 86 marjorie mar j or ie 260 260 285 22 25 pot 116 115 8 30 star 313.90 31390 314 17 20 teapot ibo 140 140 eko iho 162 8 20 trial 1660 1660 2300 40 40 77 wall aj 2j 2 2030 2900 35 91 washington 2720 3300 42 145 weir 46 46 15 4 total 1033534 10335.34 1033534 13149 686 786 1 V storage rights 830534 8305.34 830534 acre feet except for wail lake would be transferred to jordanelle Jor danelle reservoir aj 2j 2 wall wali waii wail lake has been tentatively selected to continue supplying irrigation water in the francis area 93 |
Identifier | http://cdm15999.contentdm.oclc.org/cdm/ref/collection/WesternWatersProject/id/5265 |