Record Details

page 3-63

Digital Collections at BYU

Field Value
Title page 3-63 Final environmental impact statement on the Wasatch County Water Efficiency Project and Daniel Replacement Project, page 3-63
Coverage Electronic reproduction;
Format 3-63 text/PDF
Rights Brigham Young University; http://lib.byu.edu/about/copyright/generic.php Public Domain Public
Language English; eng; en
Relation Central Utah Project; Western Waters Digital Library; increase the difficulty of operation especially during freezing conditions construction cost and operational difficulty were criteria considered by the instream In stream flow work group in selecting select iniz streams to receive supplemental instream instrearn in stream flows CUWCD would have little or no control over management of westside ditch because it is situated in the north fields area which would not be included in the WCWEP there would be no changes in operation or management of the westside ditch under the proposed action existing private water rights dictate management of irrigation flows in westside ditch the westside ditch was not identified in the study plan for aquatic resources field work and was not surveyed section 431.5 4315 4315 on pages W 43 4 3 and W 44 4 4 of the draft EIS states that the fishery technical committee first met on march 3 1992 to develop a field work plan for heber valley streams additional meetings were held on march 31 3 1 may 6 may 27 and june 2 1992 prior to conducting the aquatic resources field work the agencies organizations and technical experts consulted as listed in section 431.5 4315 4315 did not include the westside ditch in the study plan for aquatic resources field work consultation and coordination regarding supplemental instream instrearn in stream flows were conducted as described in chapter 4 section 431.5 4315 4315 on pages W 43 4 3 and W 44 4 4 and section 431.6 4316 4316 on page W 44 4 4 all of the agencies and organizations listed in these sections were consulted and their representatives participated in formulation of this element of the proposed action the fishery technical advisory committee accepted the recommendations of the instream In stream flow work group with minor changes to several terms at the meeting held on may 26 1994 these recommendations were incorporated into the proposed action for analysis in the EIS 363 3 63
Identifier http://cdm15999.contentdm.oclc.org/cdm/ref/collection/WesternWatersProject/id/3970

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press