Record Details

Summary of the Central Arizona Project and Power Considerations

University of Arizona CONTENTdm Server Respository

Field Value
Title Summary of the Central Arizona Project and Power Considerations
Description Document: Summary of the Central Arizona Project and Power Considerations, November 8, 1966 (thermofax), page 2 -2- 3. Off-and On-Peak Power Pumping In general, if the CAP is built to accommodate off-peak pumping, you need 1 mill per KWH savings in power cost to equal the added investment in the project in tunnels and pumps. 4. CAP Power Costs At 61/2 mills, it is $12 million annually; At 4 mills, it is $7,400,000 annually; At 21/2 mills, it is $4,600,000 annually. 5. Bureau Power Studies Presently Carried on in Phoenix Set out below are the different situations the Bureau is... Epson Perfection 4870 Photo, 400 dpi, 24 bit, 1,705,931 bytes
Creator Unknown
Date 1966-11-08 2006-9-26; 2006-09-28
Type text
Format image/jpeg
Identifier su04942.jpg http://server16127.contentdm.oclc.org/u?/udallcoloradoAZU,14589
Source Az 372 Box 169, Folder 4
Language eng

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press