Record Details
Field | Value |
---|---|
Title | Summary Report - Central Arizona Project with Federal Prepayment Power Arrangements |
Description | Summary Report, Central Arizona Project with Federal Prepayment Power Arrangements, February 1967, page 11 purposes. The right would also include delivery of the power on jointly shared transmission facilities. Current studies indicate that 400,000 kilowatts of capacity would be required in connection with the Central Arizona Project as proposed with the Granite Reef Aqueduct sized at 2,500 c.f.s. In this way, the project would obtain power for pumping at a low cost reflecting the economy of large thermal electric powerplants; shared economical, high-capacity, extra-high-voltage transmission... Epson Perfection 4870 Photo, 400 dpi, 8 bit, 720,227 bytes |
Creator | United States Department of the Interior, Bureau of Reclamation |
Date | 1967-02 2006-9-26; 2006-09-27 |
Type | text |
Format | image/jpeg |
Identifier | su05448.jpg http://server16127.contentdm.oclc.org/u?/udallcoloradoAZU,13964 |
Source | Az 372 Box 169, Folder 10 |
Language | eng |