Record Details
Field | Value |
---|---|
Title | A Plan to Transport Surplus Columbia River Basin Water to the Arid Pacific Northwest |
Description | Document: "Snake-Colorado Project, A Plan to Transport Surplus Columbia River Basin Water to the Arid Southwest", October, 1963, table 5 TABLE 5 ANNUAL COSTS FOR SNAKE-COLORADO PROJECT Capital (3% Annual Interest Rate, 100-Year Life) $1,397.4 Million X .03165 = $44.2 Million Year $ Million/Year Operation, Maintenance & Replacement 8.0 Pumping Power (6 mills/KWH, 100% load factor) 61.1 Power Reparations* (3 mills/KWH, 100% load factor) 14.6 83.7 Power Revenue (6 mills/KWH above Lake Mead, 1.4 mills/KWH at Hoover and Davis, 40% load factor) 60.7 Net Operation, Maintenance, & Power 23.0 23.0 Net Annual... Epson Perfection 4870 Photo, 400 dpi, 8 bit, 1,131,861 bytes |
Creator | Department of Water and Power City of Los Angeles |
Date | 1963-10 2006-9-26; 2006-09-26 |
Type | text |
Format | image/jpeg |
Identifier | su08158.jpg http://server16127.contentdm.oclc.org/u?/udallcoloradoAZU,11055 |
Source | Az 372 Box 174, Folder 9 |
Language | eng |