Record Details
Field | Value |
---|---|
Title | Report on Lower Colorado River Project |
Description | Report: United States Department of the Interior, Bureau of Reclamation, "Report on Lower Colorado River Project," Revised Draft, 6/7/63, page 56 Assignment of Costs As numerous activities would benefit from this proposed project plan, it is necessary to assign the construction costs and annual operation and maintenance costs in a rational manner to each beneficiary. In making this assignment, a separable cost-remaining benefit method of analysis was used insofar as practicable. Some of the individual proposed developments have been studied previously as independent developments and cost allocations made on this basis. Others are... Epson Perfection 4870 Photo, 400 dpi, 8 bit, 3,093,982 bytes |
Creator | United States Department of the Interior, Bureau of Reclamation |
Date | 1963-06-07 2006-9-19; 2006-09-21 |
Type | text |
Format | image/jpeg |
Identifier | su02302.jpg http://server16127.contentdm.oclc.org/u?/udallcoloradoAZU,7831 |
Source | Az 372 Box 166, Folder 8 |
Language | eng |