Record Details
Field | Value |
---|---|
Title | Special Studies: Delivery of Water to Mexico |
Description | United States Department of Interior, Stewart L. Udall, Secretary, Bureau of Reclamation, Floyd E. Dominy, Commissioner, Region 3, A.B.West, Regional Director, "Special Studies, Delivery of Water to Mexico", February, 1963, page 79 E. Pipe Drainage Investigations A primary requirement of the proposed plan is to maintain adequate drainage for the Wellton-Mohawk lands under any eventuality. Under the selective pumping plan, wells in selected areas would be shut down in the winter to reduce the salinity content of the channel discharge, and these areas would then be double-pumped during the summer months while wells discharging better quality water would be shut down. The analyses possible within the time limitations... Epson Perfection 4870 Photo, 400 dpi, 8 bit, 1,902,708 bytes |
Creator | United States Department of the Interior, Bureau of Reclamation |
Date | 1963-2-1 2006-09-14 |
Type | text |
Format | image/jpeg |
Identifier | su01220.jpg http://server16127.contentdm.oclc.org/u?/udallcoloradoAZU,6135 |
Source | Az 372 Box 165 |
Language | eng |