Title | Table 5 |
Type | text |
Format | jpg |
Identifier | su08158 http://server16127.contentdm.oclc.org/u?/udallcoloradoAZU,4002 |
Description | TABLE 5 ANNUAL COSTS FOR SNAKE-COLORADO PROJECT Capital (3% Annual Interest Rate, 100-Year Life) $1,397.4 Million X .03165 = $44.2 Million Year $ Million/Year Operation, Maintenance & Replacement 8.0 Pumping Power (6 mills/KWH, 100% load factor) 61.1 Power Reparations* (3 mills/KWH, 100% load factor) 14.6 83.7 Power Revenue (6 mills/KWH above Lake Mead, 1.4 mills/KWH at Hoover and Davis, 40% load factor) 60.7 Net Operation, Maintenance, & Power 23.0 23.0 Net Annual Cost for 2.4... Epson Perfection 4870 Photo, 400 dpi, 8 bit, 16,336,896 bytes |