Description Lake Mead. This new supply, merging with Colorado River water, would continue downstream to Lake Havasu and would generate additional power at Hoover and Davis Power Plants. Due to the power drop being substantially greater than the required lift, the project would generate approximately 10% more energy than it would consume. The total construction cost would be $1.4 billion, including interest during construction. The net annual cost would be approximately $76 million which includes $9.2... Epson Perfection 4870 Photo, 400 dpi, 8 bit, 16,490,496 bytes