Record Details

Page 62

University of Arizona CONTENTdm Server Respository

Field Value
Title Page 62
Type text
Format jpg
Identifier su07731 http://server16127.contentdm.oclc.org/u?/udallcoloradoAZU,3543
Description use for 50-year and 100-year periods of analysis. Table 10 summarizes the derivation of the annual equivalent costs which would be required to construct and operate the project facilities. All annual equivalents, both benefits and costs, are based on 21/2 percent interest for 50- and 100-year periods of analysis. Benefit-cost analysis--As shown in tables 9 and 10, the annual equivalent benefits and costs attributable to the construction and operation of the Central Arizona Project would be... Epson Perfection 4870 Photo, 400 dpi, 8 bit, 14,151,680 bytes

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press