Record Details
Field | Value |
---|---|
Title | Page 10 |
Type | text |
Format | jpg |
Identifier | su06794 http://server16127.contentdm.oclc.org/u?/udallcoloradoAZU,2576 |
Description | This plan contemplates the addition of approximately 2,000 c.f.s to the proposed East Side Division conveyance facilities from the Sacramento River via the Hood-Clay pump connection and thence through the East Side Canal facilities to the Kern River. From that location, a new 2,000-c.f.s. canal would be constructed to connect with the California Aqueduct at Wheeler Ridge Pumping Plant No. 1. These proposed facilities are shown in plan and profile on plate 4. The Pacific Southwest Water Plan... Epson Perfection 4870 Photo, 400 dpi, 8 bit, 14,882,816 bytes |