Description | Zeutschel OS7000, 400 dpi, 8 bit, 7,376,316 bytes The estimated construction cost of the proposed Navajo Indian irrigation project is about $135 million at January 1958 prices. Operation, maintenance, and replacement costs are estimated to average about $481,000 annually at January 1958 prices for both 60-year and 100-year periods of analysis. The benefit-cost ratio for the project would be 0.64 to 1 on the basis of direct irrigation benefits only, and 1.44 to 1 on the basis of total irrigation benefits. The appraisal of annual economic... |