Record Details

Vail installation calculations

Claremont Colleges Digital Library

Field Value
Title Vail installation calculations
Subject Cost; Measurement; Overhead costs; Supply and demand
Description Vail installation calculations for Schedule H and I (time, standby, operating cost, overhead, cost of line and maximum demand). The highest use in any one month as measured by the meter and lower/upper plant is the 'maximum demand'.
Publisher Honnold Mudd Library. Special Collections
Language eng
Source Dataset, 4 scanned pages: Willis S. Jones Papers, Box 1, Folder 11, Honnold Mudd Library, Special Collections.
Relation Willis S. Jones Papers California Water Documents - https://ccdl.claremont.edu/digital/collection/cwd
Rights The Claremont Colleges Library, Special Collections Copyright for unpublished materials authored or otherwise produced by the creator(s) of this collection has not been transferred to The Claremont Colleges Library, Special Collections. Copyright status for other materials is unknown. Transmission or reproduction of materials protected by U.S. Copyright Law (Title 17, U.S.C.) beyond that allowed by fair use requires the written permission of the copyright owners. Works not in the public domain cannot be commercially exploited without permission of the copyright owners. Responsibility for any use rests exclusively with the user. For more information on copyright or permissions for this image, please contact Honnold Mudd Library Special Collections at https://library.claremont.edu/scl/
Type Text; Image
Format image/jp2
Identifier cwd01005 http://ccdl.libraries.claremont.edu/cdm/ref/collection/cwd/id/11751

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press