Record Details

Historic Channel Change and Post-Project Analysis of a Habitat Restoration Project on the Upper Strawberry River, Utah

DigitalCommons@USU

Field Value
Title Historic Channel Change and Post-Project Analysis of a Habitat Restoration Project on the Upper Strawberry River, Utah
Creator Baillie, Marshall Bruce
Description Restoration of the upper Strawberry River included bank stabilization techniques because it was assumed that excessive bank erosion was degrading spawning habitat for Bonneville cutthroat trout (Oncorhynchus clarki Utah)(BCT). Using a long-term aerial photograph record, we determined the historic range of variability in bank erosion rates and channel geometry, and used this information to assess present-day conditions and the rationale for restoration. Relative to historic variability, bank...
Date 2011-05-01T07:00:00Z
Type text
Format application/pdf
Identifier https://digitalcommons.usu.edu/gradreports/131 info:doi/10.26076/52eb-984e https://digitalcommons.usu.edu/context/gradreports/article/1131/viewcontent/MarshalBruceBaillie.pdf
Rights Copyright for this work is held by the author. Transmission or reproduction of materials protected by copyright beyond that allowed by fair use requires the written permission of the copyright owners. Works not in the public domain cannot be commercially exploited without permission of the copyright owner. Responsibility for any use rests exclusively with the user. For more information contact the Institutional Repository Librarian at digitalcommons@usu.edu.
Source All Graduate Plan B and other Reports, Spring 1920 to Spring 2023
Publisher DigitalCommons@USU
Subject Historic Change Analysis Habitat Restoration Strawberry River Utah

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press