Record Details
Field | Value |
---|---|
Title | Dworshak Dam Project 50 (Three-cableway system) |
Creator | Cronk & Associates |
Description | Shows three-cableway system to place concrete in dam. Photo of artist's drawing. Note on back: "Artist's painting of three-cableway system being used to place concrete in Dworshak Dam. It is 2915 feet between the head towers (right) and tail towers (background). The bucket, weighing 25 tons with its load of concrete, travels across the river gorge at 2200 feet per minute and down the dam site at 950 feet per minute. The batch plants are at lower left. The sand and aggregate comes into the... |
Date | 1965 |
Subject | Curtis, Bert, 1903-1985; Idaho -- Dworshak Reservoir; Dworshak Dam (Idaho); Dworshak Dam Project; 1965; three-cableway system; concrete; artist's drawing; Cronk and Associates; towers; bucket; river gorge; batch plants; sand; aggregate; conveyor belts; hopper cars; Dworshak Dam Constructors; contractors; Dravo Corporation; Duane L. Cronk |
Relation | PG 13 http://www.lib.uidaho.edu/digital/dworshak/ |
Source | MG 147; http://archiveswest.orbiscascade.org/ark:/80444/xv44807/ |
Type | Image;StillImage |
Format | image/jpg |
Rights | Material produced by the United States Army Corp of Engineers and is in Public Domain. For more information, please contact University of Idaho Library Special Collections and Archives Department at libspec@uidaho.edu https://creativecommons.org/p ublicdomain/mark/1.0/ |
Language | eng |
Coverage | Dworshak Dam (Idaho) |
Identifier | http://digital.lib.uidaho.edu/cdm/ref/collection/dworshak/id/536 |