Record Details
Field | Value |
---|---|
Title | Canal lining and construction--dozer in backfill operation |
Creator | Foss, H.E. |
Date | 1950-05-12 |
Description | Columbia Basin Project, Irrigation Division, Long Lake Headworks, Specs. 2324. View from the operation deck looking N.W. at slab #1 right. Hand compacted backfill operations are being conducted by pushing material over the top with a D-& dozer. A level shelf is being formed by hand shoveling from loose material pushed in and the material is compacted in horizontal layers 3 to 4 inches in depth. The inlet cutoff wall in the center of the picture is the upstream limit of the structure. Work is... |
Subject | Columbia Basin Reclamation Project (U.S.); |
Coverage | United States--Washington--Grant County |
Source | PG 94, Box 1, Folder Canal Lining and Construction, 4 3786 |
Publisher | University of Idaho Library Digital Initiatives, http://www.lib.uidaho.edu/digital/ University of Idaho Library Special Collections and Archives |
Relation | Columbia River Basin Project Collection http://www.lib.uidaho.edu/digital/crbp/ |
Language | eng |
Type | Image;StillImage |
Format | image/jpg |
Rights | Material produced by the United States Army Corp of Engineers. In Public Domain. For more information, please contact University of Idaho Library Special Collections and Archives Department at libspec@uidaho.edu. https://creativecommons.org/publicdomain/mark/1.0/ |
Identifier | http://digital.lib.uidaho.edu/cdm/ref/collection/crbproj/id/1288 |