Record Details
Field | Value |
---|---|
Title | Spillway and drum gate construction--spillway section from left bank [02] |
Creator | Fuller, H.W. |
Date | 1944-08-16 |
Description | General view of the spillway section of Grand Coulee Dam, taken from the west bank for the Columbia River. On this date, approximately 80,000 cubic feet of water per second was plunged nearly 350 feet vertically down the face of the dam, creating a waterfall more than twice the height of Niagara. An additional 25,000 cubic feet of water per second is passing through the hydro-turbine installed in the west powerhouse. |
Subject | Dam construction--Washington (State)--1940-1950; |
Coverage | United States--Washington--Grant County--Grand Coulee Dam Grand Coulee Dam |
Source | PG 94, Box 1, Spillway and Drum Gate Construction, 2 4138 |
Publisher | University of Idaho Library Digital Initiatives, http://www.lib.uidaho.edu/digital/ University of Idaho Library Special Collections and Archives |
Relation | Columbia River Basin Project Collection http://www.lib.uidaho.edu/digital/crbp/ |
Language | eng |
Type | Image;StillImage |
Format | image/jpg |
Rights | Material produced by the United States Army Corp of Engineers. In Public Domain. For more information, please contact University of Idaho Library Special Collections and Archives Department at libspec@uidaho.edu. https://creativecommons.org/publicdomain/mark/1.0/ |
Identifier | http://digital.lib.uidaho.edu/cdm/ref/collection/crbproj/id/1161 |