Installation of turbines and generators--completed rotor

University of Idaho Digital Collections

Field Value
Title Installation of turbines and generators--completed rotor
Creator Fuller, H.W.
Date 1942-11-28
Description A tight fit. The clearance between the huge 25-foot rotors and the stators of the two 75,000 kilowatt Shasta Dam generators, being installed at Grand Coulee Dam to make additional power available for war industries, is only 5/8 inch. Lowering this 450 ton wheel into place, the operators of the two powerhouse cranes, that jointly supported the load, were guided by workmen, stationed around the rim, who inserted sticks between the stationary and moving parts to measure the clearance and prevent...
Subject Power plants--Washington (State)--Grand Coulee Dam--1940-1950;
Coverage United States--Washington--Grant County--Grand Coulee Dam Grand Coulee Dam
Source PG 94, Box 1, Installation of Turbines and Generators, 3 10872
Publisher University of Idaho Library Digital Initiatives, http://www.lib.uidaho.edu/digital/ University of Idaho Library Special Collections and Archives
Relation Columbia River Basin Project Collection http://www.lib.uidaho.edu/digital/crbp/
Language eng
Type Image;StillImage
Format image/jpg
Rights Material produced by the United States Army Corp of Engineers. In Public Domain. For more information, please contact University of Idaho Library Special Collections and Archives Department at libspec@uidaho.edu. https://creativecommons.org/publicdomain/mark/1.0/
Identifier http://digital.lib.uidaho.edu/cdm/ref/collection/crbproj/id/1038