Record Details

Installation of turbines and generators--installation of scroll case

University of Idaho Digital Collections

Field Value
Title Installation of turbines and generators--installation of scroll case
Creator United States. Army. Corps of Engineers.
Date 1942-07-11
Description The 190-ton scroll case for 103,000 horsepower Allis-Chalmers hydro turbine unit being installed in the west powerhouse at Grand Coulee Dam. This unit consists of several radial and on straight section of welded plate steel riveted with double butt straps. One half of combined unit is lifted by an overhead crane and moved into position. Before being poured in concrete, the scroll case is given hydraulic test of 310 pounds to the square inch. This scroll case, designed for use at Shasta Dam...
Subject Power plants--Washington (State)--Grand Coulee Dam--1940-1950;
Coverage United States--Washington--Grant County--Grand Coulee Dam Grand Coulee Dam
Source PG 94, Box 1, Installation of Turbines and Generators, 3 10383
Publisher University of Idaho Library Digital Initiatives, http://www.lib.uidaho.edu/digital/ University of Idaho Library Special Collections and Archives
Relation Columbia River Basin Project Collection http://www.lib.uidaho.edu/digital/crbp/
Language eng
Type Image;StillImage
Format image/jpg
Rights Material produced by the United States Army Corp of Engineers. In Public Domain. For more information, please contact University of Idaho Library Special Collections and Archives Department at libspec@uidaho.edu. https://creativecommons.org/publicdomain/mark/1.0/
Identifier http://digital.lib.uidaho.edu/cdm/ref/collection/crbproj/id/1015

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press