Record Details

Equipment for construction, transportation, and maintenance--steel casing from turbine

University of Idaho Digital Collections

Field Value
Title Equipment for construction, transportation, and maintenance--steel casing from turbine
Creator Pomeroy, F.B.
Date 1941-04-03
Description One steel casing for a giant turbine at the Grand Coulee Dam makes a full carload. Water from the Columbia River, falling through this 16-foot runner at the rate of 141 tons a second, will drive the biggest electric generator ever built, to produce electricity for the manufacture of aluminum, vital need of the defense program.
Subject Dam construction--Washington (State)--1940-1950;
Coverage United States--Washington--Grant County--Grand Coulee Dam Grand Coulee Dam
Source PG 94, Box 1, Folder Equipment for Construction, Transportation, and Maintenance, 3 8167
Publisher University of Idaho Library Digital Initiatives, http://www.lib.uidaho.edu/digital/ University of Idaho Library Special Collections and Archives
Relation Columbia River Basin Project Collection http://www.lib.uidaho.edu/digital/crbp/
Language eng
Type Image;StillImage
Format image/jpg
Rights Material produced by the United States Army Corp of Engineers. In Public Domain. For more information, please contact University of Idaho Library Special Collections and Archives Department at libspec@uidaho.edu. https://creativecommons.org/publicdomain/mark/1.0/
Identifier http://digital.lib.uidaho.edu/cdm/ref/collection/crbproj/id/973

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press