Record Details

Construction methods and Long Lake dam--Long Lake Headworks during concrete placing [02]

University of Idaho Digital Collections

Field Value
Title Construction methods and Long Lake dam--Long Lake Headworks during concrete placing [02]
Creator Foss, H.E.
Date 1949-09-28
Description Columbia Basin Project, Irrigation Division, Specifications No. 2324, Schedule I, Long Lake Headworks and Concrete Canal Lining and Structures, Station 745+80 to Station 1101+29.0--Constractor: George B. Henly Construction Co., Inc. View of Long Lake Headworks during concrete placing operations in the right outlet warp wall. Concrete is being placed in tremies which allow the concrete to be deposited in the counterforts back of the wall. Men in foreground with Klug Construction Co. hand...
Subject Dam construction--Washington (State)--1940-1950;
Coverage United States--Washington--Stevens County--Long Lake Long Lake
Source PG 94, Box 1, Folder Construction Methods and Long Lake Dam, 4 3201
Publisher University of Idaho Library Digital Initiatives, http://www.lib.uidaho.edu/digital/ University of Idaho Library Special Collections and Archives
Relation Columbia River Basin Project Collection http://www.lib.uidaho.edu/digital/crbp/
Language eng
Type Image;StillImage
Format image/jpg
Rights Material produced by the United States Army Corp of Engineers. In Public Domain. For more information, please contact University of Idaho Library Special Collections and Archives Department at libspec@uidaho.edu. https://creativecommons.org/publicdomain/mark/1.0/
Identifier http://digital.lib.uidaho.edu/cdm/ref/collection/crbproj/id/935

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press