Record Details
Field | Value |
---|---|
Title | Construction methods and Long Lake dam--gravel dumping and conveyor belt |
Creator | Foss, H.E. |
Date | 1948-09-08 |
Description | Columbia Basin Project--Irrigation Division. West Canal and East Low Canal--Specifications 1286 and 1422. View of equipment used by contractor Winston-Utah Construction Company to charge overhead aggregate bins at Adco batching plant. Truck is dumping 1 1/2"" gravel from Adrian gravel plant into wooden bin equipped with sprinklers. Conveyor belt runs through tunnel under four bins, enabling operator to charge any size aggregate bins (see August report--photo No. 2006-4). Note bulk cement cars... |
Subject | Dam construction--Washington(state)--1940-1950; |
Coverage | United States--Washington--Grant County--Stratford Stratford |
Source | PG 94, Box 1, Folder Construction Methods and Long Lake Dam, 4 2068 |
Publisher | University of Idaho Library Digital Initiatives, http://www.lib.uidaho.edu/digital/ University of Idaho Library Special Collections and Archives |
Relation | Columbia River Basin Project Collection http://www.lib.uidaho.edu/digital/crbp/ |
Language | eng |
Type | Image;StillImage |
Format | image/jpg |
Rights | Material produced by the United States Army Corp of Engineers. In Public Domain. For more information, please contact University of Idaho Library Special Collections and Archives Department at libspec@uidaho.edu. https://creativecommons.org/publicdomain/mark/1.0/ |
Identifier | http://digital.lib.uidaho.edu/cdm/ref/collection/crbproj/id/917 |