Record Details
Field | Value |
---|---|
Title | Construction methods and Long Lake dam--rooter pulled by tractor through cemented gravel |
Creator | Foss, H.E. |
Date | 1949-05-20 |
Description | Columbia Basin Project, Irrigation Division, Specifications No. 2541, Schedule No. 2, Earthwork, Concrete Lining and Structures, Station 734+85 to Station 1229+74, West Canal. Contractor: Morrison-Knudsen Company, Inc. LaPlant-Choate rooter pulled by D-8 caterpillar tractor through cemented gravel at about Sta. 785. Only two outside ripper teeth are being used. Note difference in penetration of teeth, indicating varying harness of deposit. West Canal located between Soap Lake, Washington and... |
Subject | Columbia Basin Reclamation Project (U.S.); |
Coverage | United States--Washington--Stevens County--Tumtum |
Source | PG 94, Box 1, Folder Construction Methods and Long Lake Dam, 4 2695 |
Publisher | University of Idaho Library Digital Initiatives, http://www.lib.uidaho.edu/digital/ University of Idaho Library Special Collections and Archives |
Relation | Columbia River Basin Project Collection http://www.lib.uidaho.edu/digital/crbp/ |
Language | eng |
Type | Image;StillImage |
Format | image/jpg |
Rights | Material produced by the United States Army Corp of Engineers. In Public Domain. For more information, please contact University of Idaho Library Special Collections and Archives Department at libspec@uidaho.edu. https://creativecommons.org/publicdomain/mark/1.0/ |
Identifier | http://digital.lib.uidaho.edu/cdm/ref/collection/crbproj/id/913 |