Record Details

Vol2_020_July-August 1932

Weber State University Stewart Library Digital Collections

Field Value
Title Vol2_020_July-August 1932
Creator Utah Construction Company; Six Companies, Inc.
Contributor Six Companies, Inc.; Wattis, E. O.
Description "1413-1414 These pictures, together with the two on the opposite page, complete the panorama of the canyon rim operations on the Nevada side of the river. In the picture to the left is shown the open cut excavation for the Nevada spillway. Above the spillway excavation is the start of the fill for the cableway bench. At the right is shown trucks hauling excavated rock to the Nevada spoil dumps. August 12th, 1932. 1394 This picture was taken at the Nevada abutment of the Dam.... In 1931, Utah joined Six Companies Inc. to raise the surety required to bid for the Boulder (Hoover) Dam contract. One of the world’s largest dams, Hoover Dam was completed in 1936 at a cost of $49 million. These scrapbooks document through photographs the construction of the dam showcasing UCC's part in its creation. black and white photographs 4 x 5.3 in. or 8 x 4.8 in. paper background 10 x 13.5 in.
Date 1932; 1933
Subject Boulder City (Nev.); Dams--Design and construction; Hoover Dam (Ariz. And Nev.); Six Companies, Inc; Utah Construction Company
Format image/jpeg
Publisher Stewart Library, Weber State University
Language eng
Coverage Hoover Dam (Ariz. and Nev.)
Type Image
Source MS 100 Boxes 126-130
Relation http://library.weber.edu/asc/ucc/regindex/default.cfm
Rights Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University.
Identifier http://dc.weber.edu/cdm/ref/collection/EOWAT/id/229

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press