Record Details

Vol2_027_August 1932

Weber State University Stewart Library Digital Collections

Field Value
Title Vol2_027_August 1932
Creator Utah Construction Company; Six Companies, Inc.
Contributor Six Companies, Inc.; Wattis, E. O.
Description "1411-1412 These pictures together with the two on the opposite page, form a panorama of operations being carried on at the canyon rim, on the Nevada side. Photograph was taken from the Arizona spillway site. To the left is shown the Black Canyon Highway. The high level mixing plant will be located behind the fill on the road. To the right is shown the highway extension road to the Nevada spillway. Note the shovel boom projecting at the site of what was formerly Lookout Point. August... In 1931, Utah joined Six Companies Inc. to raise the surety required to bid for the Boulder (Hoover) Dam contract. One of the world’s largest dams, Hoover Dam was completed in 1936 at a cost of $49 million. These scrapbooks document through photographs the construction of the dam showcasing UCC's part in its creation. black and white photographs 4 x 5.3 in. or 8 x 4.8 in. paper background 10 x 13.5 in.
Date 1932; 1933
Subject Boulder City (Nev.); Dams--Design and construction; Hoover Dam (Ariz. And Nev.); Six Companies, Inc; Utah Construction Company
Format image/jpeg
Publisher Stewart Library, Weber State University
Language eng
Coverage Hoover Dam (Ariz. and Nev.)
Type Image
Source MS 100 Boxes 126-130
Relation http://library.weber.edu/asc/ucc/regindex/default.cfm
Rights Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University.
Identifier http://dc.weber.edu/cdm/ref/collection/EOWAT/id/202

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press