Record Details
Field | Value |
---|---|
Title | Trash rack structure being installed in front of diversion tunnel no. 2 |
Publisher | University of Nevada, Las Vegas Libraries |
Date | 1932-03-07 |
Description | Close-up of construction workers installing the foundations of a trash rack in front of the portal of diversion tunnel no. 2. This is where the first pay concrete was poured. |
Subject | Hoover Dam (Ariz. and Nev.) -- Design and construction; Construction equipment; Construction workers; Diversion tunnels; Hoover Dam (Ariz. and Nev.) -- Design and construction; Construction equipment; Construction workers; Tunnels; |
Format | image/jp2 17016 KB |
Type | Still Image |
Relation | http://digital.library.unlv.edu/u?/dig,8 |
Rights | Not to be reproduced without permission. To purchase copies of images and/or for copyright information, contact University of Nevada, Las Vegas Libraries, Special Collections at: http://www.library.unlv.edu/speccol/ |
Identifier | http://digital.library.unlv.edu:81/u?/lv_water,159 |