Record Details
Field | Value |
---|---|
Title | page 327 |
Relation | Report of The Chief of Engineers 1890 |
Date | 2006-06-16 |
Rights | This item is in the public domain. Acknowledgement of the University of Oregon Libraries as a source is requested. |
Type | page |
Format | Lexicon 418.669921875 kb 8 bit - Gray Gamma 2.2 - greyscale |
Description | RIVER AND HARBOR IMPROVEMENTS. 327 The difference of level is to be overcome by a lock with available chamber of 462 feet by 90 feet. The excavation for this chamber and the upper and lower canals lead- ing to it, for their side walls and for the masonry of the several lock and guard-gates, is substantially finished, with the exception of the up- per and lower bulkheads, the portions that lie outside of these. There is in the neighborhood of 250,000 cubic yards... |
Identifier | http://oregondigital.org/u?/wwdl,3905 |