Description | RIVER AND HARBOR IMPROVEMENTS. 1407 lower low water at the end. Total length of enrockment, 5,626 feet; total quantity of rock placed, 422,783 tons. The completed docks at Fort Canby have a capacity for unloading about 5,000 tons of stone in eight hours. Besides maintaining the plant at Fort Canby, the shops built the following plant for the first Portland, Oreg., district: One double- track revolving pile driver, complete; 1 double-track material car; 4... |