Record Details
Field | Value |
---|---|
Title | page 1941 |
Relation | gov serial set 2464 |
Date | 2006-03-23 to 2006-03-31 |
Rights | This item is in the public domain. Acknowledgement of the University of Oregon Libraries as a source is requested. |
Format | Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale and 48>24 RGB color tiffs. Omnipage 14 used to OCR 8 bit tiffs and generate text files for full text access. 16 bit grayscale and 48>24 RGB color tiffs edited in Photoshop CS 8.0: cropped, rotated, reduced in size, levels adjusted, bit depth reduced to 8 and JPEGs created. |
Description | Cost of labor $2, 310 89 Cost of material 366 39 Total for 3.1 months 2, 677 28 Cost per month 863 64 The snag-boat Corvallis was kept at work on the river until October 15, when she was laid up and the crew discharged. Between the 19th and 30th of September she was laid up on account of an attack or malarial fever which struck down the master and all hands. During the season a wing-dam was built near Wheatland and 1,192 snags removed, as shown in table. It is proposed... |
Identifier | http://oregondigital.org/u?/wwdl,3730 |