Record Details
Field | Value |
---|---|
Title | page 2219 |
Relation | gov serial set 2280 |
Date | 2006-03-16 to 2006-03-22 |
Rights | This item is in the public domain. Acknowledgement of the University of Oregon Libraries as a source is requested. |
Format | Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale and 48>24 RGB color tiffs. Omnipage 14 used to OCR 8 bit tiffs and generate text files for full text access. 16 bit grayscale and 48>24 RGB color tiffs edited in Photoshop CS 8.0: cropped, rotated, reduced in size, levels adjusted, bit depth reduced to 8 and JPEGs created. |
Description | from the channels. The boat was put in commission for similar service for a week in November, and also ten days in April. A shallow breach 90 feet long in the Pearcy's Slough Dam, made in June, 1883, was closed with brush work. In April a number of groins, 45 to 60 feet long, were placed about 10 feet apart along those portions of the dam and banks where protection against erosion was needed ; 327 bolsters, averaging 2 feet by 14 feet, made of saplings, were used in the groins. In November a... |
Identifier | http://oregondigital.org/u?/wwdl,3662 |