Record Details
Field | Value |
---|---|
Title | page 2432 |
Relation | gov serial set 2372 |
Date | 2006-03-01 to 2006-03-08 |
Rights | This item is in the public domain. Acknowledgement of the University of Oregon Libraries as a source is requested. |
Format | Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale tiffs. Omnipage 14 used to OCR 8 bit tiffs and generate text files for full text access. 16 bit grayscale and 48>24 RGB color tiffs edited in Photoshop CS 8.0: cropped, rotated, reduced in size, levels adjusted, grayscale bit depth reduced to 8 and JPEGs created. |
Description | (f) Transporting stone. All the stone quarried during the year, together with some quarried previous years, has been transported to the site of the locks, and piled in convenient places, ready for use. Most of the stone for cutting is piled in the stone-yard at the (114.0) level, and the rest in the yard near the stone-shed. Of the stone intended for backing, paying, and rubble work, a, part is piled on the protecting embankment on the right of the canal ; and a part, within reach of fixed... |
Identifier | http://oregondigital.org/u?/wwdl,3637 |