Record Details
Field | Value |
---|---|
Title | page 2378 |
Relation | gov serial set 2372 |
Date | 2006-03-01 to 2006-03-08 |
Rights | This item is in the public domain. Acknowledgement of the University of Oregon Libraries as a source is requested. |
Format | Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale tiffs. Omnipage 14 used to OCR 8 bit tiffs and generate text files for full text access. 16 bit grayscale and 48>24 RGB color tiffs edited in Photoshop CS 8.0: cropped, rotated, reduced in size, levels adjusted, grayscale bit depth reduced to 8 and JPEGs created. |
Description | The construction plant was overhauled, increased by the addition of six scows and a floating drop-hammer pile-driver,, and was worked from early August to late January, except during a suspension of operations about midwinter. Piles, brush, stone, timber, iron, rope, generally, small material, and the use of a tow-boat were obtained upon bids, after public notice. The construction work was by hired labor. Some stone, however, was placed as job work under agreement, and the United States... |
Identifier | http://oregondigital.org/u?/wwdl,3610 |