Record Details
Field | Value |
---|---|
Title | page 2046 |
Relation | gov serial set 2185 |
Date | 2006-02-13 to 2006-02-20 |
Rights | This item is in the public domain. Acknowledgement of the University of Oregon Libraries as a source is requested. |
Format | Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale tiffs. Omnipage 14 used to OCR 8 bit tiffs and generate text files for full text access. 16 bit grayscale and 48>24 RGB color tiffs edited in Photoshop CS 8.0: cropped, rotated, reduced in size, levels adjusted, grayscale bit depth reduced to 8 and JPEGs created. |
Description | The river-work project requires an actual determination of the new low-water regimen by removal of the reefs before construction of lock masonry, and an expenditure not exceeding $100,000 in improving navigation and fixing the extent and cost of further work. To carry this out the plan is to break down the Big Eddy Reef, lowering the pool at foot of the canal to the point of damaging the crossing for vessels from the eddy to the entrance; to increase the cross-section at Middle Blockhouse,... |
Identifier | http://oregondigital.org/u?/wwdl,3516 |