Record Details
Field | Value |
---|---|
Title | page 2672 |
Relation | gov serial set 2094 |
Date | 2006-02-06 to 2006-02-08 |
Rights | This item is in the public domain. Acknowledgement of the University of Oregon Libraries as a source is requested. |
Format | Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale tiffs. Omnipage 14 used to OCR 8 bit tiffs and generate text files for full text access. 16 bit grayscale and 48>24 RGB color tiffs edited in Photoshop CS 8.0: cropped, rotated, reduced in size, levels adjusted, grayscale bit depth reduced to 8 and JPEGs created. |
Description | Labor of removal of rock $6, 936 09 Labor on tramways 834 03 Drilling and blasting (two-thirds of total amount) 2, 734 35 Setting up four derricks. 272 71 Material, fuel, and supplies 489 16 Ten per cent. of cost of plant 826 12, 093 06 Amount of rock removed, 8,349 cubic yards. Cost per cubic yard, $1.45. WORK IN CHANNELS BY HIRED LABOR. For this work a drill-scow was built at the locks, and launched on the 22d of October. The scow is 80 by 24 feet. The... |
Identifier | http://oregondigital.org/u?/wwdl,3424 |