Record Details
Field | Value |
---|---|
Title | page 2647 |
Relation | gov serial set 2094 |
Date | 2006-02-06 to 2006-02-08 |
Rights | This item is in the public domain. Acknowledgement of the University of Oregon Libraries as a source is requested. |
Format | Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale tiffs. Omnipage 14 used to OCR 8 bit tiffs and generate text files for full text access. 16 bit grayscale and 48>24 RGB color tiffs edited in Photoshop CS 8.0: cropped, rotated, reduced in size, levels adjusted, grayscale bit depth reduced to 8 and JPEGs created. |
Description | below the crest of the bar, and on a line with existing beacons and buoys. During suspension of work some changes were made in the dredging appliances for more efficient service. Work was recommenced March 13, and continued until April 1. This time the cut was laid out from the extreme foot of the bar, for a depth of 18 feet at zero of gauge and average width of 90 feet, and on a line nearer to the right bank than formerly and about parallel to it. This location for the cut. was chosen... |
Identifier | http://oregondigital.org/u?/wwdl,3394 |