Record Details
Field | Value |
---|---|
Title | page 328 |
Relation | gov serial set 2011 |
Date | 2006-01-03 |
Rights | This item is in the public domain. Acknowledgement of the University of Oregon Libraries as a source is requested. |
Type | page |
Format | Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale tiffs. 390.201 kb 8 bit - Gray Gamma 2.2 - greyscale Omnipage 14 used to OCR 8 bit tiffs and generate text files for full text access. 16 bit grayscale and 48>24 RGB color tiffs edited in Photoshop CS 8.0: cropped, rotated, reduced in size, levels adjusted, grayscale bit depth reduced to 8 and JPEGs created. |
Description | reference (126), the abutment of the right-wing wall has made a proper junction with the protective embankment and stone wall ; a timber bulkhead has been built across the canal prism at station 28, to keep out backwater from the river blow stage of 20 feet on nearest gauge; a frame bulkhead has been built at station, 18 + 75, to completely in close the lock site ; bowlder quarrying has been continued to provide stone for masonry, strip the sides of the canal prism and to correct currents... |
Identifier | http://oregondigital.org/u?/wwdl,3315 |