Format | Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale tiffs. 293.55 kb 8 bit - Gray Gamma 2.2 - greyscale Omnipage 14 used to OCR 8 bit tiffs and generate text files for full text access. 16 bit grayscale and 48>24 RGB color tiffs edited in Photoshop CS 8.0: cropped, rotated, reduced in size, levels adjusted, grayscale bit depth reduced to 8 and JPEGs created. |
Description | The total amount of work done, including materials delivered by the contractors under their contract, is tabulated as follows : Material removed : Earth cubic yards.. 28, 944 Loose rock do 12, 102 Solid rock do. 26,640 Rubble blocks delivered not hammered do 549 Second-class ashlar stone, dressed ready for laying, &c do 585 Ashlar blocks delivered, not dressed do 264 Iron pipe pounds 186, 292 The work done by hired labor since the abrogation of the contract is as... |
Identifier | http://oregondigital.org/u?/wwdl,3284 |