Record Details
Field | Value |
---|---|
Title | page 2269 |
Relation | gov serial set 1955 |
Date | 2005-10-24 to 2005-10-26 |
Rights | This item is in the public domain. Acknowledgement of the University of Oregon Libraries as a source is requested. |
Type | page |
Format | Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale tiffs. 266.985 kb 8 bit - Gray Gamma 2.2 - greyscale Omnipage 14 used to OCR 8 bit tiffs and generate text files for full text access. 16 bit grayscale and 48>24 RGB color tiffs edited in Photoshop CS 8.0: cropped, rotated, reduced in size, levels adjusted, grayscale bit depth reduced to 8 and JPEGs created. |
Description | Under contract with J. L. Hallett, dated April 21, 1874, a dam was begun across Percie's Slough, an arm of the Columbia, through which (during the annual flood of this stream, the Willamette at such times being low) a large volume of water, charged heavily with sediment, flows across the Willamette near its month and out through Coon Island Slough into the Columbia again. This is considered an important agent in the formation of the bar at the mouth of the Willamette. A survey was made of... |
Identifier | http://oregondigital.org/u?/wwdl,3248 |