Record Details
Field | Value |
---|---|
Title | Appendix KK2 |
Relation | gov serial set 1905 |
Date | 2005-10-05 to 2005-10-12 |
Rights | This item is in the public domain. Acknowledgement of the University of Oregon Libraries as a source is requested. |
Type | page |
Format | Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale tiffs. 240.374 kb 8 bit - Gray Gamma 2.2 - greyscale Omnipage 14 used to OCR 8 bit tiffs and generate text files for full text access. 16 bit grayscale and 48>24 RGB color tiffs edited in Photoshop CS 8.0: cropped, rotated, reduced in size, levels adjusted, grayscale bit depth reduced to 8 and JPEGs created. |
Description | Operations were commenced on August 8 and were continued until September 18, with. more or less delay from breakage, hauling out for vessels, &c.; a channel 600 feet long, 100 feet wide, and 18 feet deep at low-wafer was opened by removing 9,405 cubic yards of sand and gravel; the buoys were properly located and the range beacons on shore changed so as to mark the line of the new channel. On September 19 the dredge was towed to SWAN ISLAND BAR, WILLAMETTE RIVER, where the usual... |
Identifier | http://oregondigital.org/u?/wwdl,3170 |