Record Details
Field | Value |
---|---|
Title | page 1033 |
Relation | gov serial set 1796 |
Date | 2005-09-08 to 2005-09-12 |
Rights | This item is in the public domain. Acknowledgement of the University of Oregon Libraries as a source is requested. |
Type | page |
Format | Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale tiffs. 255.304 kb 8 bit - Gray Gamma 2.2 - greyscale Omnipage 14 used to OCR 8 bit tiffs and generate text files for full text access. 16 bit grayscale and 48>24 RGB color tiffs edited in Photoshop CS 8.0: cropped, rotated, reduced in size, levels adjusted, grayscale bit depth reduced to 8 and JPEGs created. |
Description | a channel 75 feet wide can be obtained by removing about 300 cubic yards of rock, which can be blown off into deep water, and the channel raked. The foregoing completes the list of impediments to navigation between Corvallis and Oregon City. A careful observation of the river during its lowest stage for the past two years has shown how the obstructions at the gravel-bars occur; take for example McCloskey's Chute, 9 miles below Salem, which always gives trouble during the early part of the... |
Identifier | http://oregondigital.org/u?/wwdl,3080 |