Record Details
Field | Value |
---|---|
Title | page V-29 |
Relation | Columbia River and Tributaries |
Date | 2005-06-22 to 2005-07-21 |
Rights | This item is in the public domain. Acknowledgement of the University of Oregon Libraries as a source is requested. |
Type | page |
Format | Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale tiffs. 100.914 kb 8 bit - Gray Gamma 2.2 - greyscale Omnipage 14 used to OCR 8 bit tiffs and generate text files for full text access. 16 bit grayscale and 48>24 RGB color tiffs edited in Photoshop CS 8.0: cropped, rotated, reduced in size, levels adjusted, grayscale bit depth reduced to 8 and JPEGs created. |
Description | 5. What capability will be usable at Grand Coulee without the limit of downstream capability? 6. Will pumped storage provide an economical substitute for this hydroelectric capacity? 7. Will there be a continued installation of thermal-electric peaking units such as we had in 1972-73? 8. Completion of Ben Franklin would permit the "pond-tilting" procedure for all projects below Grand Coulee. 9. How would hourly operation for Lower Snake and Columbia Rivers be coordinated?... |
Identifier | http://oregondigital.org/u?/wwdl,2781 |