Record Details
Field | Value |
---|---|
Title | page V-26 |
Relation | Columbia River and Tributaries |
Date | 2005-06-22 to 2005-07-21 |
Rights | This item is in the public domain. Acknowledgement of the University of Oregon Libraries as a source is requested. |
Type | page |
Format | Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale tiffs. 119.957 kb 8 bit - Gray Gamma 2.2 - greyscale Omnipage 14 used to OCR 8 bit tiffs and generate text files for full text access. 16 bit grayscale and 48>24 RGB color tiffs edited in Photoshop CS 8.0: cropped, rotated, reduced in size, levels adjusted, grayscale bit depth reduced to 8 and JPEGs created. |
Description | Subsection 2.0.7 [2B6] As suggested there should be a power policy to prevent contracts being made to industries before the power is available. This would remove the obligation to construct more power sources. Power contracts with industries are made on the availability of power planned for future installation. If power were actually on the line before contracts were signed it would be excess generation which would sit idle with capital costs until the industrial plants could be built which... |
Identifier | http://oregondigital.org/u?/wwdl,2778 |