Record Details
Field | Value |
---|---|
Title | page III-24 |
Relation | Columbia River and Tributaries |
Date | 2005-06-22 to 2005-07-21 |
Rights | This item is in the public domain. Acknowledgement of the University of Oregon Libraries as a source is requested. |
Type | page |
Format | Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale tiffs. 76.621 kb 8 bit - Gray Gamma 2.2 - greyscale Omnipage 14 used to OCR 8 bit tiffs and generate text files for full text access. 16 bit grayscale and 48>24 RGB color tiffs edited in Photoshop CS 8.0: cropped, rotated, reduced in size, levels adjusted, grayscale bit depth reduced to 8 and JPEGs created. |
Description | Source PI-21 F-5 Tentative Disposition C Problem or Area of Concern 6. There should be a power policy to prevent contracts being made to industries before the power is available. This would remove the obligation to construct more power sources. COMMENT: Power contracts with industry are made such that both the loads and the power resources are available at the same time. If it were required that power be on the line before a contract is signed, it would mean that excess... |
Identifier | http://oregondigital.org/u?/wwdl,2593 |