Record Details

page 32

Oregon Digital

Field Value
Title page 32
Relation Pumped-Storage in the Pacific Northwest
Date 2005-05-10 to 2005-05-25
Rights This item is in the public domain. Acknowledgement of the University of Oregon Libraries as a source is requested.
Type page
Format Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale tiffs. 165.115 kb 8 bit - Gray Gamma 2.2 - greyscale Omnipage 14 used to OCR 8 bit tiffs and generate text files for full text access. 16 bit grayscale and 48>24 RGB color tiffs edited in Photoshop CS 8.0: cropped, rotated, reduced in size, levels adjusted, grayscale bit depth reduced to 8 and JPEGs created.
Description PROCEDURE Daily/Weekly Cycle Plants. From a map survey, suitable locations for the upper and lower reservoirs were selected, storage requirements calculated and penstock lengths determined. Project costs were then determined, based on individual cost calculations made for the following components: a. Physical (1) Embankment (Dams, Dikes, Reservoirs) (2) Relocations (3) Powerhouse (4) Penstock b. Other (1) Contingencies (25%) (2) Engineering and Overhead (12%)...
Identifier http://oregondigital.org/u?/wwdl,2147

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press