Record Details

page 87

Oregon Digital

Field Value
Title page 87
Relation Power and the Pacific Northwest
Date 2005-04-20 to 2005-05-09
Rights This item is in the public domain. Acknowledgement of the University of Oregon Libraries as a source is requested.
Type page
Format Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale tiffs. 237.483 kb 8 bit - Gray Gamma 2.2 - greyscale Omnipage 14 used to OCR 8 bit tiffs and generate text files for full text access. 16 bit grayscale and 48>24 RGB color tiffs edited in Photoshop CS 8.0: cropped, rotated, reduced in size, levels adjusted, grayscale bit depth reduced to 8 and JPEGs created.
Description generator installation schedules at such crucial Federal hydro projects as The Dalles Dam and Grand Coulee's third powerplant. The BPA Administrator, Henry R. Richmond, as Chairman of the Joint Power Planning Council, was particularly sensitive to the slippage in Federal timetables and advised the Secretary of the Interior that tight construction schedules must be maintained if the region were to avoid serious deficits in peaking capacity during the 1970's. Northwest editors echoed...
Identifier http://oregondigital.org/u?/wwdl,2012

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press