Format | Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale tiffs. 237.483 kb 8 bit - Gray Gamma 2.2 - greyscale Omnipage 14 used to OCR 8 bit tiffs and generate text files for full text access. 16 bit grayscale and 48>24 RGB color tiffs edited in Photoshop CS 8.0: cropped, rotated, reduced in size, levels adjusted, grayscale bit depth reduced to 8 and JPEGs created. |
Description | generator installation schedules at such crucial Federal hydro projects as The Dalles Dam and Grand Coulee's third powerplant. The BPA Administrator, Henry R. Richmond, as Chairman of the Joint Power Planning Council, was particularly sensitive to the slippage in Federal timetables and advised the Secretary of the Interior that tight construction schedules must be maintained if the region were to avoid serious deficits in peaking capacity during the 1970's. Northwest editors echoed... |
Identifier | http://oregondigital.org/u?/wwdl,2012 |