Format Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale tiffs. 246.819 kb 8 bit - Gray Gamma 2.2 - greyscale Omnipage 14 used to OCR 8 bit tiffs and generate text files for full text access. 16 bit grayscale and 48>24 RGB color tiffs edited in Photoshop CS 8.0: cropped, rotated, reduced in size, levels adjusted, grayscale bit depth reduced to 8 and JPEGs created.
Description high-voltage cables were installed from the unit transformers to the switchyard. Rated at 525,000 volts, when installed, these were the only known cables carrying this voltage in oil-filled pipes anywhere in the world. The total cost of the Grand Coulee third powerhouse will be more than $490 million. The first generator came on line in October 1975, to be followed by two others at 6-month intervals. The second three units are scheduled for completion in 1977 and 1978, bringing the full 3.9...
Identifier http://oregondigital.org/u?/wwdl,1996

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press