Record Details
Field | Value |
---|---|
Title | page 9 |
Relation | Power and the Pacific Northwest |
Date | 2005-04-20 to 2005-05-09 |
Rights | This item is in the public domain. Acknowledgement of the University of Oregon Libraries as a source is requested. |
Type | page |
Format | Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale tiffs. 187.335 kb 8 bit - Gray Gamma 2.2 - greyscale Omnipage 14 used to OCR 8 bit tiffs and generate text files for full text access. 16 bit grayscale and 48>24 RGB color tiffs edited in Photoshop CS 8.0: cropped, rotated, reduced in size, levels adjusted, grayscale bit depth reduced to 8 and JPEGs created. |
Description | of all the Federal generation/transmission programs and eventually included both hydroelectric and thermal plants. The Bonneville Power Administration owes much to the precedent set by Federal development of a transmission network for Muscle Shoals, a great Federal dam on the Tennessee River, which served as a guide in the drafting of the Bonneville Project Act in 1937. Actually, TVA had designed its transmission network after the grid system first used by the Hydro-Electric Power Commission... |
Identifier | http://oregondigital.org/u?/wwdl,1934 |