Record Details

page 393

Oregon Digital

Field Value
Title page 393
Relation Columbia River
Date 2005-02-22 to 2005-04-11
Rights This item is in the public domain. Acknowledgement of the University of Oregon Libraries as a source is requested.
Type page
Format Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale tiffs. 305.412 kb 8 bit - Gray Gamma 2.2 - greyscale Omnipage 14 used to OCR 8 bit grayscale tiffs and generate text files for full text access. 16 bit grayscale tiffs edited in Photoshop 6.0: cropped, rotated, reduced in size, levels adjusted, bit depth reduced to 8 and JPEGs created.
Description Electric power requirements for irrigation pumping on potential projects--Columbia River basin Pumping plant Pumping plant or project Location Acreage served Installed capacity (kilowatts) Annual power requirements (1,000 kilowatt-hours) State Upper Snake subdivision: A Minidoka north side Snake River Idah 45, 000 10, 000 30, 900 pumping. Subtotal 45, 000 10, 000 30, 900 Central Snake subdivision: Grand View projects Snake River Idaho 18, 070 5, 300 20, 300...
Identifier http://oregondigital.org/u?/wwdl,1473

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press