Record Details
Field | Value |
---|---|
Title | page 6 |
Relation | Columbia River |
Date | 2005-02-22 to 2005-04-11 |
Rights | This item is in the public domain. Acknowledgement of the University of Oregon Libraries as a source is requested. |
Type | page |
Format | Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale tiffs. 311.945 kb 8 bit - Gray Gamma 2.2 - greyscale Omnipage 14 used to OCR 8 bit grayscale tiffs and generate text files for full text access. 16 bit grayscale tiffs edited in Photoshop 6.0: cropped, rotated, reduced in size, levels adjusted, bit depth reduced to 8 and JPEGs created. |
Description | of navigation on the connected waterways of the lower Columbia, Willamette, and Snake Rivers; the provision of flood control in areas where great flood hazards now exist; and hydroelectric power installations with aggregate capacity of approximately 4,331,000 kilowatts. The construction cost of these 47 developments at current price levels, including power-transmission facilities, is estimated to be $1,843,330,000. Further appropriations to initiate or to continue, as the case may be, and to... |
Identifier | http://oregondigital.org/u?/wwdl,1463 |