Record Details

page 875

Oregon Digital

Field Value
Title page 875
Relation 1368
Date 2004-01-10 to 2004-01-12
Rights This item is in the public domain. Acknowledgement of the University of Oregon Libraries as a source is requested.
Type page
Format Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale tiffs. 245.977 kb 8 bit - Gray Gamma 2.2 - greyscale Omnipage 14 used to OCR 8 bit grayscale tiffs and generate text files for full text access. 16 bit grayscale tiffs edited in Photoshop 6.0: cropped, rotated, reduced in size, levels adjusted, bit depth reduced to 8 and JPEGs created.
Description the rapids, the place of the soundings being fixed by synchronous observation, taken with theodolites by two observers. The amount expended during the year has been $11,510 16. 2d. The amount required to complete the survey will be $2,400; but, connection with it, experimental blasting will have to be made to make a closer approximation than is given above for the cost of blasting, for the survey is intended as but a preliminary step to the removal of the rocks on the rapids. 3d. The...
Identifier http://oregondigital.org/u?/wwdl,1184

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press